Beer cooler (beer dispenser) installation manual from AMED Commercial Refrigeration

AMED is a professional commercial refrigeration equipment manufacturer, who has 21 years experience in
this field. We focused on the commercial refrigeration of beverage cooler, beer cooler, beer keg cooler &
beer dispenser, draft beer tower , Beer tap and other draft beer parts, etc.

We have the full range of the beer cooler and beer dispenser equipments. It means that we can supply to
the global market which used different voltage and frequency in different country.
For example, the voltage and frequency 115V/60HZ is used in America Market and 220V/60HZ used
America, middle east,Korea,Philippinesmarket. If it is 220-240V/50HZ,it used in Europe, Oceania,Africa
andAsiaMarket.
At the same time, we can supply all of the beer dispenser parts which used in the beer dispenser
system, such as the cooling system- flash chiller(beer cooler);Marketing parts of beer dispenser-Beer
tower, Beer Taps, Beer drip trays, Beer medallion; Connection Parts of beer dispenser-Beer Keg, Beer
Coupler,CO2 regulator,CO2 cylinder, Beer tube, Gas tube, clamps; Beer line cleaning of beer dispenser- CIP
keg machine(beer keg cleaning machine in place), Liquid beer line cleaner, Clean can, Clean system
valve, Brush, ect; Beer dispenser installation tools- fittings, coupling nuts, shut off valve, spanner, etc.

In order to make the customer and the consumer know how to install the beer dispenser – counter top
beer dispenser system, we would like to share the following instruction manual for reference. It includes 6
parts from Chapter A to Chapter F.

     A.  Beer Cooler System Sketch Map
1-       CO2 cylinder
2-       CO2 pressure reducer
3-       CO2 supply hose
4-       Dispensing head
5-       Beer keg
6-       Beer hose
7-       Beer cooler machine
8-       Beer hose and cooling hose
9-       Beer tower
10-     Beer tap
     B.  Specifications
     Counter top model of AMED Beer Cooler AM-CT01,AM-CT02. 
     C.   Installation
1.       Machine should be installed onto the surface which is flat and solid, with sufficient ventilation, keeping away from heat, erosive sources and10cmfrom wallside.
2.       Lift off the machine cover and tank cover, then fill water into tank tiel the water level indicator (i.e. exceed the copper line about2cm). Distilled water are advised to be adopted. Spilling water onto the electrical parts/motor should be strictly avoided.
3.       Connect the CO2 pressure reducer and CO2 cylinder with wrench; one terminal of the CO2 supply hose should be connected with CO2 pressure reducer and another terminal should be connected with the tilting dispensing head by hose clamp. For easier installation, the CO2 supply hose should better be immersed into warm water for about 5 minutes before installation.
4.       Connect beer hose, which should be connected with the machine beer inlet at one terminal and dispending head at the other terminal and secured with the hose clamp.
5.       Connect beer line, which should be connected with the machine beer outlet at one terminal and beer tower beer inlet at the other terminal and secured with the hose clamp.
6.       Connect the tap with tower.
D. Operation Manual
1.       After the machine has been installed and connected with electricity supply source, condensing unit and agitator motor will start to work. Under ambient temperature25℃, first glass of beer generally can be dispensed out after 2.5hours.
2.       Connect dispensing head onto beer keg, open the CO2 cylinder valve and adjust the CO2 pressure reducing meter to 0.2MPa or brewery can adjust according to their own requirement.
3.       After adjustment of CO2 pressure, press down the dispensing head and turn on the taps to begin the beer output. First glass of beer in not drinkable as it is used for cleaning the beer line.
4.       Beer glass should be titled to tap and glass internal wall should be closed to tap outlet when dispensing beer. When beer reached 3/4 of glass, set the glass back to straight up-right position and keep appropriated distance from tap allowing perfect foam formed on top of beer. If foam is not thick enough, push the tap outflow handle backward to make more foam.
E.   Warning and Cares
1.       The cooler machine should be immediately switched off when voltage fluctuates too much or voltage is too low. Don’t re-start the machine for at least 3 minutes after electricity supply has been cut off.
2.       Disconnect the electricity supply before moving the machine, and titling should not be more than 45°
3.       Disconnect the power to stop the machine, close CO2 cylinder valve, return back the compensating screw of CO2 pressure meter at the closing time.
4.       Thermostat has been pre-set to an optimum level, user should not adjust the thermostat as improper adjustment will lead to machine breakdown.
5.       Check water level and water quality per 15 days for normal operation and refill or change the water if necessary. Clean the beer lines by special cleaning tank filled with water and special cleaning detergent periodically and connect with the dispensing head, calibrate suitable CO2 pressure, circulate flushing for 2 times. Subsequent cleaning by clean water again and finally drying with CO2 to reduce damage, water splashing onto the agitator pump and other electric parts during water replacement or cleaning process should be strictly avoided.
6.       Check and clean the fan blade with a soft, dry cloth, brush or use a vacuum cleaner to remove accumulated dust to ensure well ventilation.
7.       Periodically clean the dispensing head and tap and the rubber seal should be immerged into approximate50℃warm water for about 5 minutes to keep the rubber flexibility.
8.       If the cooler machine will not be used for a long time, please clear the water tank and beer line before covering the machine and storing at a dry place.
F.        Trouble shooting
Problem
Possible Causes
What to do
1.Agitator motor, condensing unit and fan motor don’t work after connection with electricity
a. socket without electricity supply or
plug contact problem
Check by electricity meter
b. electricity wire broken or metal
plate loose form contact
Replace the wire or metal plate
c. machine totally breakdown due to
faulty electricity supply
Contact manufacturer for repair service
2.Agitator motor works but condensing unit and fan motor don’t work
a. fan blade of condensing unit are
blocked
Clear the blockage
b. thermostat defect or wire loosened
Replace thermostat or re-connect the wire
3. Condensing unit and fan motor work but agitator motor doesn’t work
a. wire broken or metal plate
loosened
Replace wire or metal
b. starting relay or motor damage
Replace agitator motor or starting relay
4.Agitator motor works but compressor irregularly switching on
a. voltage is low and protector relay
open
Improve electricity supply
b. bad ventilation lead to overheat
ambient temperature
Relocate the machine to make ventilation condition better
5.Too much noise or vibration
a. machine is grounded not firmly
Place the machine on a stable and flat ground
b. near a vibration source
Remove the vibration source
c. fan blade distorted
Repair or change the fan blade
d. axle of agitator motor curved
Repair or change the motor
6.Cooling effect is not performed satisfactorily
a. voltage is too low
Improve electricity supply
b. insufficient refrigerant
Contact special technician to check and repair
7.No cooling effect
a. system blocked or all refrigerant
leaked away if compressor still
work
Repair and check by special technician
b. wiring defect or compressor defect
if compressor don’t work
Repair and check by special technician

If you would like to know more information, please Click on Beer dispenser

As a professional commercial refrigeration company, we aim at offering the good quality and innovation commercial refrigeration products, and we believe the continuous innovation on the beer dispenser, beer keg cooler, beer taps,beer dispenser parts will support our customer to gain more market.

2015年7月20日星期一

Peanut



Quanzhou HuiAn yellow town lad, 23, xiao Chen, never imagined, pick peanuts were bitten by ants in the fields, was in a coma for three hours, also once foaming at the mouth. Yesterday morning, happen to him in this scene, the family frighten not light, in the hospital after recovery well.
Chen's family said in a field before, have seen heads around 3 mm, body mostly red ants, they suspect, ant bites xiao Chen is fire ants. Huian hospital had the doctor said, because not at the scene, not sure xiao Chen is bitten by red imported fire ants, but fire ants bite cases are not rare, a few cases once in life.
Coma after bitten by ants Even foaming at the mouth
At 8 yesterday evening, huian hospital had severe room, injured Chen mental state has returned to very good.
Talking about yesterday morning, xiao Chen some helpless, "said out are all afraid of people joke". Chen said that in recent days have a holiday home, just home peanut harvest, around 6 o 'clock in the morning yesterday, he told mother pick peanuts to the field.
"Just into the ground, should, instead, be bitten." Chen recalls, bite a few small ants, he is a field at first only feel a little sting on his foot, he also specially run to the nearby well cleaning, then continue to back to the field. As long as Chen just didn't know, don't feel a little dizzy, want to go home and rest, "because didn't get the key, only back ground for my mother". Chen said, more thought is, once again return to the ground, we'll feel whole body soft, fainted.
Chen's mother said, quickly come forward to help him up, and call to relatives, will be sent to Chen huian hospital. To go to the hospital, is about 7 o 'clock in the morning, Chen mother said, when Chen was once foaming at the mouth, but the doctor rescue in time, to around 10 o 'clock in the morning, Chen gradually regained consciousness, then into the hospital ward.
Trace elements on the growth and development of peanut has a large number of elements (such as nitrogen, phosphorus and potassium) irreplaceable role, increasing microelement fertilizer scientifically is the important measure of high quality and high yield of peanut.
Iron fertilizer Peanut dry matter per form 1 ton, need 264 grams of iron absorption. Iron deficiency, the plant small, less branching, flowering late, spend less, less nodule, poor root development. Serious when, veins green, yellow, yellowish-white, upper leaves time leaves appear brown necrotic spots, until the blade die. Applying iron fertilizer on soil of iron deficiency, the general can make the peanut yield above 10%. Application method: (1) as a basal, site preparation, mu shi ferrous sulfate 200 ~ 400 grams (mixed with organic fertilizer or calcium superphosphate application); (2) as a seed manure, before sowing, seed soaking with 0.1% ferrous sulfate solution for 24 hours, after remove dry seed sowing; Outside spraying, (3) root in peanut fancy stitch stage, podding stage or s appear symptoms, with a 0.2% ferrous sulfate solution spraying on the leaf, generally every 5 ~ 6 days time, spraying 2 ~ 3 times in a row.
Boron fertilizer Peanut dry matter per form 1 ton, need to 44 grams of boron absorption. Boron deficiency, the plant small, branch number, cluster shaped, heart leaf veins color shallow, the rest of the deep, shallow green and white; Few or even no flowers, flowering plant root easily aging, enlarge bifurcation, ability is weak, very few fibrous root, the root tip have black spots, necrosis, nut is bad; Easy to form the hollow fruit with shell without benevolence. Application of boron fertilizer on soil boron deficiency, can make the peanut yield by 7.8% ~ 22.5%. Application method: (1) as a basal, mu shi boric acid or borax 0.2 kg ~ l (mixed with organic manure or nitrogen and phosphorus fertilizer application); (2) as a seed manure, before sowing, seed soaking with 0.02% ~ 0.05% boric acid or borax solution 4 ~ 6 hours, or per kilogram of peanut stir in boric acid or borax 0.4 kg; (3) to make fertilizer, with boric acid or borax 50 ~ 100 grams per acre, mix in a few rotten organic fertilizer, topdressing before flowering; (4) the root outside spraying, beginning in peanut seedling stage, flowering and coated, with 0.2% boric acid or borax solution spraying on the leaf.
Manganese fertilizer Peanut dry matter per form 1 ton, need to absorb the 39 g of manganese. Manganese, the part between the veins of leaf blade yellowing, and veins tend to remain green. Use of manganese fertilizer on manganese soil, can make the peanut yield by 8% ~ 11%. Application method: (1) as a basal, site preparation, mu shi 1.5 ~ 3.0 kg manganese sulfate; (2) as a seed manure, before sowing, with 0.05 ~ 0.1% manganese sulfate solution soaked with 12 ~ 24 hours. Spraying outside (3) the root, beginning from the peanut 30 ~ 50 days after planting, to 15 ~ 20 days before the harvest, with 0.1% manganese sulfate solution spray once every 10 ~ 14 day; When necessary, can be mixed with peanut leaf spot of prevention and cure of fungicide application.
Peanut Kernel Manufacturer, White Garlic Supplier, China Frozen Fruits&vegetables 

Exporter - Sinonut

Sinonut is a professional manufacturer and supplier of peanut kernel, white garlic 

and frozen fruits&vegetables in China.
peanut kernel, white garlic, frozen fruits&vegetables, China, manufacturer, 

supplier, exporter http://www.sinonut.com/